It was decided to dress over this new but leaking asphalt balcony by the insurance company, the roofing details to the parapet wall and the railings is very poor the roof was leaking in several places, as the majority of the roof is detail and to dismantle the windows and the railing would be expensive the decision was to take a two stage approach to stoping the roof from leaking.
The first stage would be to cover the old asphalt roof and all the up stands using the kemperol v210 system observe if this stooped the problem if not stage two would be to remove the railings and the doors and dress the roofing system under forming the flashings correctly. Luckily stage one stooped the roof from leaking and the very costly stage two was never implemented, the ability of the Kemper to seal around the railings and directly to the asphalt solved all the leaks.